HOW MUCH ROAD RESURFACING DO YOU GET FOR $1,000,000? Last week I submitted to the Town Board a proposed capital budget --which included $1,000,000 for road resurfacing. Received this interesting info from the Commissioner of Public Works, Victor Carosi
At a recent work session, I was asked to approximate the costs of paving a roadway per mile. Including various costs items that are incorporated into a paving project, such as milling old asphalt, and averaging a roadway width to 28 feet, a very rough estimate for general budgeting purposes is $275,000 per mile. The current draft capital budget proposes $1,000,000 for roadway resurfacing. At the estimated $/mile, 1 Million dollars buys 3.6 miles of paving. Note the Town has approximately 130.8 miles of roadway.
AN APOLOGY....
Last Friday I posted info about a job fair for students that was held yesterday in White Plains. The fair was sponsored by the city of White Plains. I learned of the job fair for students from lohud.com. When I read the news release I was under the impression that the event was open to everyone. I was wrong. Students had to pre-register for the event. I apologize to those who were inconvenienced. A student intern in my office is trying to locate summer job openings that may still be available.
REMINDER: STORY WALK AT HARTSBROOK NATURE TRAIL SATURDAY MORNING AT 10:30
If you have small children, you should take them to Hartsbrook Nature Trail (off of Ridge Road) Saturday morning at 10:30. STORY WALK is an exciting way to encourage kids to love reading and open space. Book pages are placed on stilts along the nature trail.
PAUL FEINER
Wednesday, June 02, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment